HomePortalFAQSearchMemberlistUsergroupsRegisterLog in
Rumors of a List are beginning to circle around the school... A list of what...?
I love you, Pillow ♥
Ebony was here.
Do you have any ideas for future events? Tell us!
You looked so beautiful.

Share | 
 

 Project Geneseed

Go down 
AuthorMessage
Pikachu

avatar

Posts : 1389
Beata Bucks : 2416
Join date : 2015-04-01
Location : hnnng

PostSubject: Project Geneseed   Wed Aug 30, 2017 8:10 am

P R O J E C T    G E N E S E E D
Dr. G. Ikari & Dr. P. Malak



The following document is only for authorised personnel with LEVEL 6 clearance and above.

AUTHORITY: 10 USC 504, 505, 507, 532, 978, 1201, 1202, and 4346; and E.O. 9397

Report of Medical ExaminationprojecteveprojecteveprojecteveDate of Examination : 31/08/2037

3. Name : E v eprojecteveprojecteveprojecteveprojecteveprojecteveprojecteveGrade : Alpha
Date of Birth : 23/03/2037projecteveproAge : 5 months 8 daysjecteveprojectevSex : Female
NB Gift : R.HprojecteveA Gift : C E N S O R E Dprojecteveprojecteveprojecteveprojectevep

Clinical Evaluation : See Form 3b.projecteveprojecteveprojecteveprojecteveprojecteveproje

Subject notes :projecteveprojecteveprojecteveprojecteveprojecteveprojecteveprojecteveproj
Dr G. Ikari & Dr. P. Malak, 23/03/2037
-Chemical analysis of cells indicate Eve has the correct GIFT-
Further testing will be necessary.

Dr G. Ikari & Dr. P. Malak, 30/03/2037
-Eve CONFIRMED GIFTED-
Subject Adam is no longer needed, Eve will be moved to Chamber 3B for first extraction.

Dr G. Ikari & Dr. P. Malak, 06/04/2037
-A GIFT #1 has been successfully transplanted-
Eve is in recovery.

Dr G. Ikari & Dr. P. Malak, 12/04/2037
-A GIFT #2 has been successfully transplanted-
Eve is in recovery.

Dr G. Ikari & Dr. P. Malak, 18/04/2037
-A GIFT #3 has been successfully transplanted-
Minor complications from interference from Project K mid-surgery. Eve still functional.

Dr G. Ikari & Dr. P. Malak, 24/04/2037
-A GIFT #4 has been successfully transplanted-
Further transplants are on hold till required subjects are collected.

Dr G. Ikari & Dr. P. Malak, 06/04/2037
-Eve relocated to safe house-
Social isolated mandated, her relationship with Adam is concerning.

Dr. P. Malak, 20/05/2037
-Eve is displaying increasingly erratic behaviour associated with social isolation.-
I recommend that she be allowed to associate with other gifted children for future stability.


Dr G. Ikari, 21/05/2037
-Eve is performing as hypothesised-
Eve is to remain isolated. Only personnel vetted by Dr Ikari be allowed to interact with her.
Wear masks when interacting with Eve

Dr G. Ikari, 08/06/2037
-Eve has assimilated to her new conditions-
Eve's progress is on track, she should be ready by 25/09/2037

Dr G. Ikari, 14/06/2037
-Eve eliminated Adam in LAB 08C-
Eve is estimated to ready for combat trials by 01/07/2037

Dr G. Ikari, 18/06/2037
-Eve placed in stasis-
The development of her GIFTs has been more rapid than expected. For safety of personnel,
Eve is to remain in cryostasis unless Level 8+ personnel requests her.

CCTV FEED AT TIME OF INCURSION :

Back to top Go down
View user profile
Pikachu

avatar

Posts : 1389
Beata Bucks : 2416
Join date : 2015-04-01
Location : hnnng

PostSubject: Re: Project Geneseed   Wed Aug 30, 2017 8:25 am

Ḑ̴̭̠͓̗̭̪̩͊̐̓̋̓̽͗͘̚Ė̷̡̬͍͉̘̽̆̾̀̊͘C̪̩̮̭̹̔̐̒͂̾ͅR̶̨͙̥͇͙̭̽̂̍͌̏̅̕̕͟͞Ŷ̶̡͍͙̮̻̯̥͈͚̊̇͂́̂́̈́͡͡P͙̟̘̫̩̃̿͗͐̓͌̋͆̓͝Ṱ̱̟͇̖̇͌̎́̓Ę̵̛̘͓͎̬̠̩͇͐̽̈́̈̄̈̀̕͜Ḋ̴̛̗̥̠̠͈̓̋̄̊̆̈́͞͡ F̧̙͖̺̙̜̻̮̀̿͑̑͑͒͟͜I͉̩̼͎̳͇͙͔̹̓́͐͛̃̋̿̊̚ͅL̷̥̖̺̦͉̹̙̠͌̆̇͊̈́̊̀̐̀͒E̡̢͕̲͖̣̭̳͓̘̊̃͌̈̆͘͞͝S̴̛̰̰̤̝̙̫͗͆̒́








Back to top Go down
View user profile
 
Project Geneseed
Back to top 
Page 1 of 1

Permissions in this forum:You cannot reply to topics in this forum
Beata Academy :: Off-Topic :: Plotting Pages-
Jump to: