HomePortalFAQSearchMemberlistUsergroupsRegisterLog in
Rumors of a List are beginning to circle around the school... A list of what...?
I love you, Pillow ♥
The Summer Tournament has begun! Head on over to the Island and cheer for your favorites!
Do you have any ideas for future events? Tell us!
You looked so beautiful.

Share | 
 

 Project Geneseed

View previous topic View next topic Go down 
AuthorMessage
Crippling Roollage Debt

avatar

Posts : 1379
Beata Bucks : 1395
Join date : 2015-04-01
Location : hnnng

PostSubject: Project Geneseed   Wed Aug 30, 2017 8:10 am

P R O J E C T    G E N E S E E D
Dr. G. Ikari & Dr. P. Malak



The following document is only for authorised personnel with LEVEL 6 clearance and above.

AUTHORITY: 10 USC 504, 505, 507, 532, 978, 1201, 1202, and 4346; and E.O. 9397

Report of Medical ExaminationprojecteveprojecteveprojecteveDate of Examination : 31/08/2037

3. Name : E v eprojecteveprojecteveprojecteveprojecteveprojecteveprojecteveGrade : Alpha
Date of Birth : 23/03/2037projecteveproAge : 5 months 8 daysjecteveprojectevSex : Female
NB Gift : R.HprojecteveA Gift : C E N S O R E Dprojecteveprojecteveprojecteveprojectevep

Clinical Evaluation : See Form 3b.projecteveprojecteveprojecteveprojecteveprojecteveproje

Subject notes :projecteveprojecteveprojecteveprojecteveprojecteveprojecteveprojecteveproj
Dr G. Ikari & Dr. P. Malak, 23/03/2037
-Chemical analysis of cells indicate Eve has the correct GIFT-
Further testing will be necessary.

Dr G. Ikari & Dr. P. Malak, 30/03/2037
-Eve CONFIRMED GIFTED-
Subject Adam is no longer needed, Eve will be moved to Chamber 3B for first extraction.

Dr G. Ikari & Dr. P. Malak, 06/04/2037
-A GIFT #1 has been successfully transplanted-
Eve is in recovery.

Dr G. Ikari & Dr. P. Malak, 12/04/2037
-A GIFT #2 has been successfully transplanted-
Eve is in recovery.

Dr G. Ikari & Dr. P. Malak, 18/04/2037
-A GIFT #3 has been successfully transplanted-
Minor complications from interference from Project K mid-surgery. Eve still functional.

Dr G. Ikari & Dr. P. Malak, 24/04/2037
-A GIFT #4 has been successfully transplanted-
Further transplants are on hold till required subjects are collected.

Dr G. Ikari & Dr. P. Malak, 06/04/2037
-Eve relocated to safe house-
Social isolated mandated, her relationship with Adam is concerning.

Dr. P. Malak, 20/05/2037
-Eve is displaying increasingly erratic behaviour associated with social isolation.-
I recommend that she be allowed to associate with other gifted children for future stability.


Dr G. Ikari, 21/05/2037
-Eve is performing as hypothesised-
Eve is to remain isolated. Only personnel vetted by Dr Ikari be allowed to interact with her.
Wear masks when interacting with Eve

Dr G. Ikari, 08/06/2037
-Eve has assimilated to her new conditions-
Eve's progress is on track, she should be ready by 25/09/2037

Dr G. Ikari, 14/06/2037
-Eve eliminated Adam in LAB 08C-
Eve is estimated to ready for combat trials by 01/07/2037

Dr G. Ikari, 18/06/2037
-Eve placed in stasis-
The development of her GIFTs has been more rapid than expected. For safety of personnel,
Eve is to remain in cryostasis unless Level 8+ personnel requests her.

CCTV FEED AT TIME OF INCURSION :

Back to top Go down
View user profile
Crippling Roollage Debt

avatar

Posts : 1379
Beata Bucks : 1395
Join date : 2015-04-01
Location : hnnng

PostSubject: Re: Project Geneseed   Wed Aug 30, 2017 8:25 am

Ḑ̴̭̠͓̗̭̪̩͊̐̓̋̓̽͗͘̚Ė̷̡̬͍͉̘̽̆̾̀̊͘C̪̩̮̭̹̔̐̒͂̾ͅR̶̨͙̥͇͙̭̽̂̍͌̏̅̕̕͟͞Ŷ̶̡͍͙̮̻̯̥͈͚̊̇͂́̂́̈́͡͡P͙̟̘̫̩̃̿͗͐̓͌̋͆̓͝Ṱ̱̟͇̖̇͌̎́̓Ę̵̛̘͓͎̬̠̩͇͐̽̈́̈̄̈̀̕͜Ḋ̴̛̗̥̠̠͈̓̋̄̊̆̈́͞͡ F̧̙͖̺̙̜̻̮̀̿͑̑͑͒͟͜I͉̩̼͎̳͇͙͔̹̓́͐͛̃̋̿̊̚ͅL̷̥̖̺̦͉̹̙̠͌̆̇͊̈́̊̀̐̀͒E̡̢͕̲͖̣̭̳͓̘̊̃͌̈̆͘͞͝S̴̛̰̰̤̝̙̫͗͆̒́








Back to top Go down
View user profile
 
Project Geneseed
View previous topic View next topic Back to top 
Page 1 of 1

Permissions in this forum:You cannot reply to topics in this forum
Beata Academy :: Off-Topic :: Plotting Pages-
Jump to: